| |
Location: | Ludwigshafen am Rhein, Germany |
Operator: | Technische Werke Ludwigshafen AG |
Commissioning: | 12/30/2011 |
| |
| |
| |
PV system power: | 387.500 kWp |
Annual Production: | approx. 381,688 kWh (985 kWh/kWp) |
CO2 avoided: | Approx. 267.2 tons per annum |
| |
| |
| |
Modules: | BYD Europa B.V. BYD 240P6-30 (EU) |
Communication: | Sunny WebBox |
Inverter: | 31 x Sunny Tripower 12000TL-10 |
| |
| |