| |
| Location: | Dorsten, Germany |
| Operator: | Guido Trienen |
| Commissioning: | 5/15/2013 |
| |
| |
| |
| PV system power: | 5.300 kWp |
| Annual Production: | approx. 4,913 kWh (927 kWh/kWp) |
| CO2 avoided: | Approx. 3.4 tons per annum |
| |
| |
| |
| Modules: | Perfectenergy PEM-180/185-72M-SCC |
| Communication: | Sunny Home Manager |
| Inverter: | Sunny Boy 5000TL-20 |
| |
| |
|  |
Description:
Anlage ging 30.09.2010 in Betrieb
sunny Home Manager Mitte Mai 2013 |