Location: | Ukunda, Kenya |
Operator: | Mekaela Academies |
Commissioning: | 2/25/2011 |
| |
| |
| |
PV system power: | 18.900 kWp |
Annual Production: | approx. 23,625 kWh (1,250 kWh/kWp) |
CO2 avoided: | Approx. 23.6 tons per annum |
Nominal battery capacity: | 2,500 Ah |
Battery type: | Flooded lead acid batt. (FLA) |
| |
| |
| |
Modules: | First Solar FS-275 |
Communication: | SMA Cluster Controller |
Inverter: | 4 x Sunny Island 5048
3 x Sunny Mini Central 6000TL |
Sensors: | Sunny Sensorbox |
COMGateway: | SMA COM Gateway |
| |
| |
|  |
Description:
Site+Operator: Mekaela Academies,
Likunda Primary School, Ukunda, Kenya
Technical Data:
PV rated power: 18,9 Kilowatt (kWp)
Annual energy yield: ca. 24.000 kWh
Electricity cost savings: ca. ??? Euro annually
Modules: 252x First Solar FS-252 (CdTe) á 75 Wp
Tilt angle / orientation: 7°N / 57°E
Covered area: 450 m²
wiring: 9x4 parallel strings à 7 modules in series
Off-grid inverter: 3x SMA Sunny Island 5048
Grid tied inverter: 3x SMA Sunny Mini Central 6000TL
Batteries: 24x Hoppecke OPzS 2500 á 2V / 2500 Ah
Substructure: Phoenix ground based system on locally constructed support structure
Specialty: grid independent electricity supply for school, grid only serves as backup
Extras: comprehensive data logging, remote control via internet
Start of operation: 25.Feb 2011
Installed by: Mekaela Academies
Planning, supply, instruction&supervision by: PHOENIX SOLAR, Sulzemoos, Germany
|