Skå 46 - WebBox PV System Profile
Location:SKÄRHOLMEN, Sweden
Operator:Peter Lundh
Commissioning:7/1/2006
PV system power:7.480 kWp
Annual Production:approx. 7,106 kWh (950 kWh/kWp)
CO2 avoided:Approx. 5.0 tons per annum
Modules:Panasonic VBHN240SE10
Communication:Sunny WebBox
Inverter:2 x Sunny Boy 3000TL-21
Sunny Boy 700
Sunny Boy 3.6 1AV-41

Description:


Plant commissioned 2006, mainly extended 2012, 2016, 2019:
  • 2020-03-22: swapped a 210 panel to 250 Wp (7.48 kWp)
  • Sept 2019: added 7x HIT-N250SE10 panels, +1.75 kWp (7.44 kWp)
  • July 2016: added 4x HIT-N245SE10 panels, +0.98 kWp (5,69 kWp)
  • June 2012: panels from 2011 re-installed (4.71 kWp)
  • May 2012: re-arranged to 16x Sanyo HIT-N240SE10 (3.84 kWp)
  • July 2011: added a 4th panel HIT-N240SE10 (0.87 kWp)
  • July 2006: first plant, 3x Sanyo HIP-210NHE1 panels (0.63 kWp)
Strings with number of panels (peak Power): Azimut (clock-wise from south), Inclination (from horisontal) [degrees]:
  • 8 (1920 Wp): +12, 39
  • 8 (1920): +12, 39
  • 7 (1750): +11, 28
  • 4 (980): +12, 14
  • 4 (910): -78, 65
Annual Yield:   = AC energy [kWh] / DC power [kWp]
  • 2020:   970 = 7259/7.48
  • 2019:   908 = 4774/5,69 + 515/7.44 kWp
  • 2018:   974 = 5541/5.69 kWp
  • 2017:   889 = 5056/5.69
  • 2016:   954 = 4959/(mix of 4.71 and 5.69 kWp)
  • 2015:   965 = 4543/4.71 kWp
  • 2014:   940 = 4428/4.71
  • 2013: 1100 = 5181/4.71
  • 2012:   710     extended to 3.84, then 4.71 kWp, plant down 6 weeks
  • 2011: 1019 = mix of 0.63 and 0.87 kWp
  • 2010:   887
  • 2009:   971
  • 2008:   975
Loading © 2024 SMA Solar Technology AG   |   Home   |   Information   |   User manuals   |   FAQ   |   Terms of Use   |   Data protection declaration   |   Legal Notice