City of Las Vegas - WSC Fleet PV System Profile
| |
Location: | Las Vegas, United States |
Operator: | City of Las Vegas |
Commissioning: | 1/17/2012 |
| |
| |
| |
PV system power: | 78.687 kWp |
Annual Production: | approx. 141,637 kWh (1,800 kWh/kWp) |
CO2 avoided: | Approx. 99.1 tons per annum |
| |
| |
| |
Communication: | Sunny WebBox |
Inverter: | Sunny Boy 6000US Sunny Boy 7000US 8 x Sunny Boy 8000US |
| |
| |
| |
Description:
As a part of the City’s Sustainable Energy Strategy, the City has installed more than 4 megawatts of solar, including solar covered parking installations at parks, community centers, and fire stations. Two phases of solar covered parking have been completed, with the first completed in July 2010, totalling 827 kW. The second phase, completed in December 2011, brought the City's total to 1.8 MW of solar covered parking over 1,720 parking spaces.
At the Vehicle Services Center at the City's West Yard, located in western Las Vegas within Ward 4, panels shade 48 parking spaces. The total size of the system is 77 kW and will generate approximately 154,000 kWh, offsetting the building's meter by about 45 percent. Funding for the project came from New Clean Renewable Energy Bonds and NV Energy SolarGenerations rebates. Contributing to the successful completion of the project was the "design-build" team lead by CORE Construction.
|