St. Edward's CE Academy PV System Profile
Location:
Leek, United Kingdom
Operator:
MEB Total Ltd
Commissioning:
6/27/2012
PV system power:
28.000 kWp
Annual Production:
approx. 21,952 kWh (784 kWh/kWp)
CO2 avoided:
Approx. 11.4 tons per annum
Modules:
JA Solar
Communication:
Sunny WebBox
Inverter:
Sunny Tripower 10000TL-10
Sunny Tripower 17000TL-10
Description:
The Solar Panel Installation was complete in June 2012 and consist of 120 x JA 250w Panels. The First 40 panels were complete on 23/2/12 and have a SMA 10,000 TL Inverter. The remaining 70 panels where installed after the existing electrical supply was up graded the inverter is a SMA 17,000TL (27/6/12). Two different Feed in Tariff rates therefore apply
© 2024 SMA Solar Technology AG |
Home
|
Information
|
User manuals
|
FAQ
|
Terms of Use
|
Data protection declaration
|
Legal Notice
Your Browser does not support JavaScript!
JavaScript is required to use Sunny Portal. Enable JavaScript in your browsersettings and reload this Website to try again.
Ihr Internetbrowser unterstützt JavaScript nicht!
JavaScript wird für die Verwendung von Sunny Portal benötigt. Aktivieren Sie JavaScript in den Einstellungen Ihres Internetbrowsers und aktualisieren Sie die Ansicht dieser Internetseite.