St. Edward's CE Academy PV System Profile
Location:Leek, United Kingdom
Operator:MEB Total Ltd
Commissioning:6/27/2012
PV system power:28.000 kWp
Annual Production:approx. 21,952 kWh (784 kWh/kWp)
CO2 avoided:Approx. 11.4 tons per annum
Modules:JA Solar
Communication:Sunny WebBox
Inverter:Sunny Tripower 10000TL-10
Sunny Tripower 17000TL-10

Description:


The Solar Panel Installation was complete in June 2012 and consist of 120 x JA 250w Panels.  The First 40 panels were complete on 23/2/12 and have a SMA 10,000 TL Inverter.  The remaining 70 panels where installed after the existing electrical supply was up graded the inverter is a SMA 17,000TL (27/6/12).  Two different Feed in Tariff rates therefore apply