Sonnenkraftwerk Alte Post PV System Profile
| |
Location: | Halver, Germany |
Operator: | Stefan Heinrich |
Commissioning: | 10/26/2012 |
| |
| |
| |
PV system power: | 16.715 kWp |
Annual Production: | approx. 14,208 kWh (850 kWh/kWp) |
CO2 avoided: | Approx. 9.9 tons per annum |
| |
| |
| |
Modules: | 54 x Heckert-Solar HS-NeMo P 210 25 x Heckert-Solar HS-NeMo P 215 |
Azimuth angle: | 135° |
Angle of inclination: | 30° |
Communication: | Sunny WebBox |
Inverter: | Sunny Tripower 15000TL-10 |
| |
| |
| |
Description:
powered by:
Stefan Heinrich
Ingenieurbüro / Handelsvertretung
In der Hälver 20
58553 Halver
Tel. 02355-516163 oder 0173-2637675
|