Location:Doetinchem, Netherlands
Operator:Stichting Minimanna / BUHA
Commissioning:4/22/2015
PV system power:10.920 kWp
Annual Production:approx. 9,730 kWh (891 kWh/kWp)
CO2 avoided:Approx. 6.8 tons per annum
Communication:SMA Webconnect
Inverter:Sunny Tripower 10000TL-20

Description:


 Onze installlatie aan de Tollensstraat