COV Administration Building PV System Profile
| |
Location: | Leederville, Australia |
Operator: | City of Vincent |
Commissioning: | 3/25/2020 |
| |
| |
| |
PV system power: | 99.710 kWp |
Annual Production: | approx. 159,436 kWh (1,599 kWh/kWp) |
CO2 avoided: | Approx. 121.2 tons per annum |
| |
| |
| |
Modules: | 338 x REC Solar AS |
Azimuth angle: | -88°, 92° |
Angle of inclination: | 3° |
Communication: | 3 x SMA Webconnect |
Inverter: | 3 x Sunny Tripower 25000TL-30 |
| |
| |
|  |
Description:
99.71 kW Local Government Solar PV System in Leederville
Equipment:
- 338 x TwinPeak 2 295TP2-BLK REC Solar Panels
- 3 x Sunny Tripower 25000TL-30 SMA Solar Inverter
- 15 x ABB DC isolators
System Installer:
18 Stirling Highway, Nedlands WA 6009
T: 08 6181 2845 | E: mail@dnxenergy.com.au
W: www.dnxenergy.com.au | FB: facebook.com/dnxenergy
|