Helling Bohmte PV System Profile
| |
| Location: | Bohmte, Germany |
| Commissioning: | 1/30/2015 |
| |
| |
| |
| PV system power: | 5.625 kWp |
| Annual Production: | approx. 5,006 kWh (890 kWh/kWp) |
| CO2 avoided: | Approx. 3.5 tons per annum |
| |
| |
| |
| Modules: | Heckert Solar AG NeMo P225 (05/2013) |
| |
| |
|  |
Description:
Installiert von Renos Solar and Green Energy im Januar 2015
|