City of Las Vegas - VMCC PV System Profile
Location:Las Vegas, United States
Operator:City of Las Vegas
Commissioning:8/15/2011
PV system power:116.021 kWp
Annual Production:approx. 208,838 kWh (1,800 kWh/kWp)
CO2 avoided:Approx. 146.2 tons per annum
Modules:United Solar PVL-136 (02/2006)
Communication:Sunny WebBox
Inverter:4 x Sunny Boy 5000US
Sunny Boy 6000US
15 x Sunny Boy 7000US

Description:


As a part of the City’s Sustainable Energy Strategy, the City has installed more than 4 megawatts of solar, including solar covered parking installations at parks, community centers, and fire stations. Two phases of solar covered parking have been completed, with the first completed in July 2010, totalling 827 kW. The second phase, completed in December 2011, brought the City's total to 1.8 MW of solar covered parking over 1,720 parking spaces.


At Veterans Memorial Community Center, located in Summerlin within Ward 2, panels shade 150 parking spaces. The total size of the system is 116 kW and will generate approximately 232,000 kWh, offsetting the building's meter by about 30 percent. Funding for the project came from EECBG (ARRA) funds and NV Energy SolarGenerations rebates. Contributing to the successful completion of the project was the "design-build" team lead by Thor Construction.