Gebhard Solar Array PV System Profile
Location:Tenhult, Sweden
Commissioning:5/17/2016
PV system power:5.200 kWp
Annual Production:approx. 5,080 kWh (977 kWh/kWp)
CO2 avoided:Approx. 3.6 tons per annum
Modules:Einnova Solarline ESM 315
Communication:SMA Webconnect
Inverter:Sunny Tripower 5000TL-20

Description:


18st Einnova Solarline 315W mono kopplade till en SMA Tripower 5000TL-20.
Anläggningen är levererad av Electrotec Energy.
Loading © 2025 SMA Solar Technology AG   |   Home   |   Information   |   User manuals   |   FAQ   |   Terms of Use   |   Data protection declaration   |   Legal Notice