RVI Medford Airport Phase III PV System Profile
Location:Medford, United States
Commissioning:10/22/2015
PV system power:36.000 kWp
Annual Production:approx. 47,844 kWh (1,329 kWh/kWp)
CO2 avoided:Approx. 9.9 tons per annum
Modules:90 x SolarWorld AG
30 x Sunpower X21-345 (03/2013)
Azimuth angle:165°
Angle of inclination:30°
Communication:2 x SMA Webconnect
Inverter:Sunny Tripower 12000TL-US-10
Sunny Tripower 24000TL-US-10

Description:


Third phase of a solar electric system installation for the Medford Airport. The system size is 36KW with an estimated annual
output of 47,846 kWh. This phase includes the addition of 3 parking canopies and adding 30 modules to the existing Toll Booth.
All solar arrays have a 165 degree orientation and are mounted on 30 degree tilted roofs.

The parking canopies incorporate the following system components:
30 - Solarworld 285 watt mono modules for each canopy. 90 modules in total.
They are in configured in 3 strings of 10 and all three arrays are connected to 1- SMA 24000 inverter.

The Toll Booth incorporates the following components:
30 - Sunpower SPR X21-345 watt modules. Configured in 2 strings of 7 and 2 strings of 8.
The array is connected to 1- SMA 12000 inverter.